DIP LED / Extended lead options

Long Lead DIP LED Series

Long lead DIP LED series for 3mm, 5mm, 8mm and 10mm through-hole LED assemblies requiring extended leads for special mounting conditions.

3mm / 5mm / 8mm / 10mmIF=20mA70-150 degree1000PCS/bag
KINGBRIGHT Long Lead DIP LED Series product image and specification table

Product Summary

Through-Hole LED for Stable Visual Indication

Long Lead DIP LED Series is designed for overseas buyers and engineers who need a dependable through-hole LED component for visual indication, display electronics and equipment status lighting. Compared with surface-mount LEDs, DIP LED components provide a stronger mechanical mounting structure after soldering and are often selected for control panels, instruments, signal boards, appliance indicators and PCB assemblies that require visible lens height.

This product belongs to the Long Lead DIP LED range and uses a extended lead options with a package size of 3mm / 5mm / 8mm / 10mm. The specification table includes color, wavelength, luminous intensity, forward voltage, current, viewing angle and packaging data for engineering comparison. Buyers can use these parameters to match the LED with drive circuits, panel openings, viewing distance, color requirements and assembly method before confirming samples or mass production.

For purchasing teams, the main selection points are emitted color, brightness range, lens shape, viewing angle and packing method. A narrow viewing angle can provide stronger front visibility, while a wider angle is useful when the indicator must remain visible from different positions. Multi-color versions are suitable for alarm, operating mode, charging, fault and status display designs where two or more signals need to be shown in a compact LED position.

KINGBRIGHT supports OEM and ODM customers with sample review, datasheet confirmation, color matching, brightness discussion and export order communication. If your project needs a specific brightness bin, special lead length, customized color combination or PCBA integration support, please share the drawing, PCB layout, driving current, annual demand and target application so the engineering and sales team can recommend the proper DIP LED option.

Engineering Snapshot

Long Lead DIP LED Series engineering product appearance on white background
Model Family
Long Lead DIP LED
Package Size
3mm / 5mm / 8mm / 10mm
Color Options
Red, yellow, orange, green, purple, blue and white
Packaging
1000PCS/bag

Technical Specifications

Long Lead DIP LED Series Electrical and Optical Data

ModelPackage SizeColorWavelength (nm)Luminous Intensity (mcd)Forward Voltage (V)CurrentViewing AnglePackaging
All Series with long feet3MM / 5MM / 8mm / 10mmRed620-630100-150001.8-2.4IF=2070-150 deg1000PCS/bag
All Series with long feet3MM / 5MM / 8mm / 10mmYellow585-595100-100001.8-2.4IF=2070-150 deg1000PCS/bag
All Series with long feet3MM / 5MM / 8mm / 10mmOrange600-610100-100001.8-2.4IF=2070-150 deg1000PCS/bag
All Series with long feet3MM / 5MM / 8mm / 10mmGreen510-535200-100002.6-3.2IF=2070-150 deg1000PCS/bag
All Series with long feet3MM / 5MM / 8mm / 10mmPurple390-400100-10003.0-3.6IF=2070-150 deg1000PCS/bag
All Series with long feet3MM / 5MM / 8mm / 10mmBlue460-470100-80002.6-3.2IF=2070-150 deg1000PCS/bag
All Series with long feet3MM / 5MM / 8mm / 10mmWhite/500-200002.6-3.2IF=2070-150 deg1000PCS/bag

Product Features

DIP LED Features for OEM Buyers

Through-hole package with stable mechanical mounting on PCB assemblies
Multiple emitted color options for signal, status and display indication
Standard IF=20mA electrical data for engineering comparison
Custom color, brightness and lead options can be reviewed for OEM projects
Mono-color versions support clear and reliable visual indication

Applications

Typical Application Areas

Industrial control panelsSignal indicatorsDisplay and signage electronicsConsumer electronicsAutomotive and equipment status indicationOEM PCB assemblies

Datasheet Support

The electrical table above is converted from the supplied KINGBRIGHT product specification image. For signed datasheets, binning confirmation or customized brightness/color requirements, please contact our sales engineer.

Get Product Datasheet

Quality and Project Review

KINGBRIGHT can support DIP LED selection based on lens shape, brightness range, color, viewing angle, PCB mounting method, packaging requirement and export project schedule.

Review Quality Control

FAQ

Long Lead DIP LED Series Buyer Questions

What is the package size of Long Lead DIP LED Series?

Long Lead DIP LED Series uses a 3mm / 5mm / 8mm / 10mm through-hole LED package.

Which colors can be supplied?

The available options include Red, yellow, orange, green, purple, blue and white. Special color or brightness requirements can be reviewed for OEM orders.

What current is used for the listed data?

The listed specification table is based on IF=20mA. Please confirm your driving circuit before production.

Can KINGBRIGHT provide samples?

Yes. Please send the target model, color, quantity, application and shipping information for sample arrangement.

DIP LED Inquiry

Discuss Long Lead DIP LED Series with KINGBRIGHT

Send your model, color, target brightness, lens type, sample quantity and annual demand. Our sales engineer can support quotation, datasheet confirmation and sample arrangement.